A new office buildout is exciting, but the network cabling is almost always the piece that gets squeezed. Walls go up fast, the general contractor is focused on framing and finishes, and the low-voltage scope quietly slides to the bottom of the list. Then move-in week arrives and there is nowhere to plug in the phones, the Wi-Fi is patchy, and the server closet is a shared janitor’s space with no power. We have walked into that situation more than once across Chicagoland, and the fix after drywall is always more expensive than doing it right the first time.

Here is the part most tenants miss: in a typical lease, the tenant improvement (TI) allowance often does not cover IT infrastructure, cabling, security systems, or AV. Those usually come out of your own budget, which means you want them planned early and scoped accurately, not discovered as a surprise. This checklist walks through what to nail down, roughly in the order it matters during a buildout.

Start before the walls: the planning phase

The cheapest time to run cable is when the ceiling is open and the studs are bare. That window is short, so the planning has to happen before construction, not during it. Get your low-voltage contractor looking at the floor plan at the same time the architect and GC are finalizing it.

Lock down the floor plan and headcount

Every one of those becomes a cable drop. It is far better to over-provision a few drops now than to cut into finished walls later for the one you missed.

The telecom room: your MDF and IDF closets

Every office needs a real home for its network gear. On a single floor that is one main room, often called the MDF (main distribution frame). On multiple floors or a large footprint you add IDF (intermediate distribution frame) closets so no cable run gets too long. This matters because copper Ethernet has a hard limit of about 90 meters for the permanent cable run, plus patch cords. Anything beyond that needs an IDF closet closer to the work area, with fiber tying it back to the main room.

When you mark that closet on the plan, make sure it actually works as a telecom room. The things people forget:

Getting closet location and power right is where the GC, the electrician and the cabling contractor have to talk to each other. That coordination is the single biggest thing that goes wrong on buildouts, so make someone own it.

Choosing the cabling

For the horizontal runs from the closet out to each desk, AP, camera and phone, Cat6 is the practical standard for most offices, with Cat6a a smart upgrade where you want headroom for 10-gig or longer runs feeding access points. For the backbone between an IDF and the MDF, fiber is the right call: it carries far more bandwidth, runs much longer distances, and gives you room to grow. If you want a deeper comparison, our guide on Cat6 vs. Cat6a breaks down where each one earns its keep.

A few rules of thumb we hold to on every job:

Label, test and document before go-live

This is the step that separates a clean install from a closet full of spaghetti. Every cable should be labeled at both ends to a consistent scheme, color-coded by function where it helps (data, voice, camera). Then the whole plant gets tested and certified with proper gear, not just a quick continuity check. Certification confirms each run actually meets its rated performance, and it gives you a report you can hand to the next contractor years from now.

Insist on as-built documentation at closeout: a labeled floor plan showing every drop, a port map for the patch panels, and the test results. This is the institutional memory of your network. Without it, the next person to touch the system starts from zero. Structured cabling done this way is the foundation everything else sits on, which is why we treat it as its own discipline; if the term is new to you, see our primer on what structured cabling actually is.

A quick sequence to keep in your back pocket

Do it in that order and your move-in week is about setting up desks, not chasing a contractor to fish one more cable through a finished wall.